You don't have javascript enabled. Good luck with that.
Pencarian
Pembangunan Turap Kali Cipinang di Pinang Ranti Dimulai
.
photo Istimewa - Beritajakarta.id

Cipinang Sheet Pile Construction in Pinang Ranti Begins

The construction of Cipinang River's sheet pile in RW 06, Pinang Ranti Urban Village, Makasar began to be built. It is targeted will be complete in one month.

We use river rocks in the project. Considering, all this time, sheet pile has never been made here

East Jakarta Water Resources Sub-dept. Head, A Yazied Bustomi disclosed the construction is focused on north side of the river as long as 200 meters. As planned, it will have 2.5 meters high.

Sheet Pile of Drain on Jl H Sanyar Needs Repair

"We use river rocks in the project. Considering, all this time, sheet pile has never been made here," he stated, Tuesday (2/7).

As a result, the overflowing water of the river is often occurred when rain pours. As a result, it has inundated the settlement. 

"After sheet pile is made, we hope similar disaster can be anticipated in future. If all goes well, it will finish in March 2017," he disclosed.

Linked News
Popular News indeks
  1. Rano: Pancasila is the Big House for Indonesia's Diversity

    access_time02-06-2025 remove_red_eye526 personBudhi Firmansyah Surapati
  2. Transjabodetabek Bogor–Blok M Route and Corridor 13 Extension Begin Operations

    access_time05-06-2025 remove_red_eye396 personDessy Suciati
  3. Friendly Countries' Ambassadors Participate in Famtrip to Seribu Islands

    access_time05-06-2025 remove_red_eye391 personAldi Geri Lumban Tobing
  4. No Odd-Even Restrictions in Jakarta on June 6-9, 2025

    access_time03-06-2025 remove_red_eye271 personAldi Geri Lumban Tobing
  5. S. Jakarta Mayor: Idul Adha is a Moment to Enhance Compassion Among One Another

    access_time06-06-2025 remove_red_eye270 personTiyo Surya Sakti

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik