You don't have javascript enabled. Good luck with that.
Pencarian
Pembangunan Turap Kali Cipinang di Pinang Ranti Dimulai

Cipinang Sheet Pile Construction in Pinang Ranti Begins

The construction of Cipinang River's sheet pile in RW 06, Pinang Ranti Urban Village, Makasar began to be built. It is targeted will be complete in one month.

We use river rocks in the project. Considering, all this time, sheet pile has never been made here

East Jakarta Water Resources Sub-dept. Head, A Yazied Bustomi disclosed the construction is focused on north side of the river as long as 200 meters. As planned, it will have 2.5 meters high.

Sheet Pile of Drain on Jl H Sanyar Needs Repair

"We use river rocks in the project. Considering, all this time, sheet pile has never been made here," he stated, Tuesday (2/7).

As a result, the overflowing water of the river is often occurred when rain pours. As a result, it has inundated the settlement. 

"After sheet pile is made, we hope similar disaster can be anticipated in future. If all goes well, it will finish in March 2017," he disclosed.

Linked News
Popular News indeks
  1. BMKG: Sunny to Cloudy Skies Forecast Across Jakarta Today

    access_time11-09-2026 remove_red_eye1680 personDessy Suciati
  2. Jakarta Reallocates Funds for Rp 250M Suckermouth Catfish Study After Pramono’s Direct Order

    access_time10-09-2026 remove_red_eye674 personFakhrizal Fakhri
  3. Jakarta Swift Response to Volcanic Ash Helps Narrow Areas with High PM10

    access_time08-09-2026 remove_red_eye472 personAldi Geri Lumban Tobing
  4. Pramono Urges Jakmania to Keep Jakarta Safe

    access_time11-09-2026 remove_red_eye434 personDessy Suciati
  5. Pramono Endorses Five-City Tour for Jazz Goes to Campus

    access_time12-09-2026 remove_red_eye409 personDessy Suciati